Steam turbine installation

Project Overview

Thorne International Boiler Services Ltd. were
contracted to complete the installation of a Siemens SST-300 turbine as part of the main installation works on two waste to energy plants in Birmingham, UK.

Scope of supply included balance of plant instrumentation, syngas steam clean piping, and temporary steam blow piping.

Included as part of STG installation, were the STG baseframe, STG cooler, flash tank, gland steam condenser, oil system and associated piping, and drain system and associated piping.

STG installed onto heavy duty anti-vibration mounts.

Boiler Details
Year of manufacture
2016
Industry
Energy from waste
Scope of supply

STG installation
BoP instrumentation
Syngas steam clean piping
Steam blow piping
Insulation / cladding
Integration into plant