Case Studies

View Our Steam Boiler Cases Below

Countries We’ve Covered

Thorne International Boiler Services (TIBS) is an expert industrial steam system and project engineering company, with extensive global experience in steam and hot water boiler markets. We are accomplished in providing a comprehensive portfolio of services to a wide range of industries. Whether supplying specialist system design, new plant installation or annual shutdown maintenance, our knowledge is unparalleled.

We have over 50 years’ experience, providing engineering solutions to businesses from more than 50 different countries. Our team of engineers are adept at supporting your organisation, whatever your steam or hot water plant requirements might be.

Bahrain, Iraq, Jordan, Lebanon, Yemen, Saudi Arabia, Angola, Egypt, Ethiopia, Ghana, Ivory Coast, Kenya, Morocco, Mozambique, Mauritius, Nigeria, Sudan, Tanzania, Uganda, Democratic Republic of Congo, Zambia, Antigua, Bahamas, Barbados, Belize, Canada, Dominican Republic, Guyana, Hawaii, Jamaica, St Kitts,   Surinam, Trinidad, USA, Venezuela, Ireland, Italy, Jersey, Kosovo, Malta, UK, Bangladesh, Fiji, India, Indonesia, Japan, Myanmar, Pakistan, Papua New Guinea, Philippines, Singapore, Sri Lanka

D-type boiler 1

D-Type water tube boiler

New bespoke D-type water tube boiler designed, manufactured, and supplied by Thorne International Boiler Services Ltd. in 2019 to an overseas sugar refinery to increase existing plant capacity.

Biomass water tube boiler

New bespoke biomass watertube boiler designed, manufactured, and supplied by Thorne International Boiler Services Ltd. in 2008 to an overseas sugar refinery to incinerate and generate steam from excess bagasse.

Waste heat shell boiler

New bespoke two-pass firetube waste heat boiler designed, manufactured, and supplied by Thorne International Boiler Services Ltd. in 2021 to a UK energy from waste project utilising waste heat from medical waste incinerator process.

Waste heat piggyback / hybrid boiler

Bespoke piggyback / hybrid waste heat boiler designed, manufactured, and supplied by Thorne International Boiler Services Ltd. in 2012 and 2015 as two phases to a UK energy from waste project.

Superheater 2023

New bespoke in-duct finned-tube superheater, designed, manufactured, and supplied by Thorne International Boiler Services Ltd. in 2023 to an overseas chemical plant as part of power generating project.

Superheater 2017

Redesigned replacement two-stage pendant superheater, designed, manufactured, and supplied by Thorne International Boiler Services Ltd. in 2017 to an overseas sugar plant.

Integrated piping system

New integrated complete piping system designed, manufactured, and supplied by Thorne International Boiler Services Ltd. in 2022 to a UK based brewery as part of plant upgrade project.

Economiser

Redesigned replacement standalone economiser designed, manufactured, and supplied by Thorne International Boiler Services Ltd. in 2021 to UK chemical plant.

Complete boilerhouse

New bespoke fully integrated boilerhouse designed, manufactured, and supplied by Thorne International Boiler Services Ltd. in 2021 to a UK sewage treatment works as part of integration of a thermal hydrolysis process.

Air heater

New bespoke air-to-air heat exchanger designed, manufactured, and supplied by Thorne International Boiler Services Ltd. in 2022 to a UK based biomass plant as part of an upgrade project.

Cyclone / grit arrestor

New bespoke cyclone / grit arrestor designed, manufactured, and supplied by Thorne International Boiler Services Ltd. in 2022 to a UK based biomass plant as part of an upgrade project.

Pressurised deaerator

New bespoke feedwater pressurised deaerator designed, manufactured, and supplied by Thorne International Boiler Services Ltd. in 2017 to UK waste to energy plant.

Steam accumulator

New bespoke accumulator vessel, designed, manufactured, and supplied by Thorne International Boiler Services Ltd. in 2014 to a UK based EfW plant as part of a large turnkey project including the supply of coil boilers, tanks, and balance of plant piping.

Indirect steam dump condenser

New bespoke indirect steam dump condenser designed, manufactured, and supplied by Thorne International Boiler Services Ltd. in 2020 to a UK energy from waste project as part of large turnkey integration project

Hotwell

New bespoke hotwell, designed, manufactured, and supplied by Thorne International Boiler Services Ltd. in 2023 to a UK based EfW plant as part of improvement project.

Steam turbine installation

Thorne International Boiler Services Ltd. were contracted to complete the installation of a Siemens SST-300 turbine as part of the main installation works on two waste to energy plants in Birmingham, UK.

SPECIALISTS IN OUR FIELD