New integrated complete piping system designed, manufactured, and supplied by Thorne International Boiler Services Ltd. in 2022 to a UK based brewery as part of plant upgrade project.
Installation and integration of four 10MW shell HPHW boilers.
Designed in accordance with BS EN 13480 including NoBo design and manufacturing appraisal, where required, and piping stress analysis / support definition.
Piping system designed to distribute HPHW to various existing brewhouse heat users.
Integration of piping and controls into existing network.
Structural steel supplied to support major equipment complete with access platforms, staircases, and ladders.
3D scan of area completed to ensure successful integration and piping hook-up.
Supplied by Thorne International Boiler Services Ltd. including installation, commissioning, and testing.