Project Overview

New bespoke hotwell, designed, manufactured, and supplied by Thorne International Boiler Services Ltd. in 2023 to a UK based EfW plant as part of improvement project.

Hotwell designed to receive preheated feedwater at 65°C and deliver feedwater to existing watertube boilers at 85°C barg at a duty / flowrate of 50,000 kg/h.

Hotwell designed in accordance with TIBS standards including structural calculations and vent calculations.

3D scan of area completed to ensure successful integration into available space and piping hook-up.

Supplied together with piping integration into existing piping network, manual / control valves, and instrumentation to control feedwater temperature.

Steam injection system utilises three spray nozzles within hotwell.

Supplied by Thorne International Boiler Services Ltd. including installation, commissioning, and testing.

Boiler Details
Duty
50,000 kg/h
Holding capacity
13.0 m3
Working temperature
85.0 °C
Year of manufacture
2023
Industry
Energy from waste
Scope of supply

Hotwell
Instrumentation
Valves
Controls
Insulation / cladding
Integration into plant

Project Overview