Project Overview

Redesigned replacement standalone economiser designed, manufactured, and supplied by Thorne International Boiler Services Ltd. in 2021 to UK chemical plant.

Included removal / dismantling of existing economiser.

Economiser designed in accordance with BS EN 12952 / PED, including NoBo design and manufacturing appraisal.

Supplied with carbon steel casing including internal insulation and carbon steel supporting structure.

Included supply of external high pressure feedwater piping and integration into existing network.

Supplied by Thorne International Boiler Services Ltd. including installation, commissioning, and testing.

Boiler Details
Duty
116,300 kg/h
Operating pressure
70.0 bara
Feedwater temperature
139.0 °C
Design code
BS EN 12952
Year of manufacture
2021
Industry
Chemical
Scope of supply

Economiser
Casing
Insulation / cladding
External piping

Project Overview

Thorne International
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.