CASE STUDY 17.0
Steam turbine installation
Thorne International Boiler Services Ltd. were contracted to complete the installation of a Siemens SST-300 turbine, as part of the main installation works on two waste to energy plants in Birmingham, UK.

Specification
Year of installation
Industry
Scope of supply
2016
Energy from waste
STG installation | BoP instrumentation Syngas steam clean piping | Steam blow piping | Insulation/cladding | Integration into plant
- Scope of supply included balance of plant instrumentation, syngas steam clean piping and temporary steam blow piping.
Included as part of STG installation were the STG baseframe, STG cooler, flash tank, gland steam condenser, oil system and associated piping, and drain system and associated piping.
STG installed onto heavy duty anti-vibration mounts.


Thorne International Boiler Services (TIBS) offer comprehensive steam boiler services to industrial and commercial environments. From new installations and refurbishments to reverse engineering, our experienced team are committed to supporting clients from the design phase, right the way through to installation and commissioning.